BIO Filter Walkway
Location
Ely, Cambridgeshire
MSL's Involvement
MSl completed the 3D site survey site, walkway design, manufacture and installation of the new suspended walkway, inclusive of the open mesh floor, keep clamp balustrade and suspended drop-link bracing struts.