Lidl Bolton
Location
Bolton
MSL's Involvement
MSL completed the 3D site survey, connection design, detailing, manufacture and installation of this 15 tons steel frame extension.
Bolton
MSL completed the 3D site survey, connection design, detailing, manufacture and installation of this 15 tons steel frame extension.