M&S Uxbridge – Plant Platform
Middleton’s have completed the 3D Site Survey, Connection Design, Technical Detailing, Manufacture and Installation. Due to the site being land locked, all steelwork had to be delivered on nights when the road was closed and installed via a 250 Ton Mobile Crane working on a 70 meter radius; a…